Our 2022-2023 projects include:

Portsmouth Naval Shipyard Superflood Project: SAMC continues to support this multi-year, $1.7B project with multibeam bathymetric surveys, data interpreation and analysis. SAMC is also providing support for the improvment of Cianbro’s Modular Manufacturing Facility in Brewer, ME as part of the Superflood project. Client: 381 Constructors

Vineyard Wind Export Cable Installation: Steele Associates is providing nearshore cable installation positioning, water quality monitoring, and as-laid cable surveys for the first U.S. commercial-scale offshore wind farm.
Client: J.F. Brennan

Northfield Mountain Hydroelectric Pumped-Storage Facility: SAMC continues to perform annual multibeam bathymetric surveys and ROV video inspection at this 300-acre power generation reservoir. For 2023, an aerial drone LiDAR survey was conducted of the surrounding area. Client: FirstLight Power Resources

Encore Boston Harbor Casino: Steele Associates performs annual multibeam and topographic monitoring surveys of an environmental cap installed following remediation dredging. Client: WSP

Tremont Swan’s Island Cable: SAMC performed multibeam bathymetric and side-scan sonar surveys of the five-mile cable installation route to Swan’s Island, ME. SAMC also provided barge positioning and navigation for cable laying operations. Client: Kokosing Industrial

Barnstable County Dredge: Steele Associates provides ongoing bathymetric surveys and autonomous survey vessel support for the Barnstable County Dredge. SAMC supports the county in maintaining navigable waterways in Cape Cod’s harbors and inlets. Client: Barnstable County

General Dynamics Electric Boat: Steele Associates remains active providing surveying services on the South Yard Assembly Building dredging and improvement project. Client: Cashman Dredging and Marine